Odoo ERP for construction & precast

Cement on site, cubes in the yard, and a running bill that matches the work done.

Tell us how you run

Precast piece

SL-0412-07 Hollow-core slab, 6 m

  1. Bed3, Jigani yard, cast 5 Nov
  2. Cube test24.1 MPa at 7 days, passed
  3. Cost₹38,400: steel, concrete, labour
  4. BilledMilestone 2 of 5, slabs 25–48
  5. ToTech park Tower B, Whitefield

Site stock

Lot HB-2207 Hollow blocks, 200 mm

  1. MadeBlock plant, Jigani, 4,000 blocks
  2. Sent2,000 to the Tower B site store
  3. Issued1,200 to level 3 walls
  4. Cost toPRJ/0412, 1,200 at ₹52, ₹62,400
  5. At site800, counted 12 Nov

Steel by heat

Heat H-4471 Steel I-beams, ISMB 300

  1. FromSteel supplier, Peenya, 10.5 t
  2. Mill testCertificate attached to the heat
  3. Price₹58,000 a tonne + 18% GST
  4. Freight₹31,500, added to the steel’s cost
  5. Cost toPRJ/0412, ₹6,40,500

Running bill

BOQ 4.2 RCC pipe, 900 mm

  1. Scope180 m, Hoskote stormwater drain
  2. Pipes2.5 m each, cast on bed 6, Jigani
  3. Laid100 m, 40 pipes, measured on site
  4. SubcontractLaying, ₹650 a metre, ₹65,000
  5. BilledRA bill 2, 100 m at ₹4,800, ₹4,80,000

What Odoo keeps track of, trade by trade.

  • A precast concrete slab

    Precast yards

    Each casting a work order on its bed, with curing time and cube results recorded. Pieces numbered and traced to the project they were cast for.

  • A hollow concrete block

    Block & paver plants

    Mix designs as bills of materials, so cement per block is known. Stock at the plant and at each customer’s site.

  • A steel I-beam

    Steel structures & fabrication

    Steel bought by weight, tagged to the project, with its heat number and mill certificate. Fabrication drawings attached to the work order.

  • A concrete pipe

    Infrastructure contractors

    Projects billed by milestone or percentage complete. Material, labour and subcontractors costed against each job.

Trade not listed? Tell us what you build

What one slab, window or column is made of, and what it really costs.

The bill of materials is the mix, the steel, the fittings and the hours for each piece, so every item is costed and traced to its pour or its batch. Point at a part to find its line.

BoM: Hollow-core slab, 3 × 1.2 m

ComponentQtyCost

Concrete, M400.9 m³₹6,300
Prestressing strand, 12.7 mm6₹3,240
Lifting anchors4₹520
Core plugs, far end5₹150
Core plugs, near end5₹150
Shuttering oil1₹60

OperationTimeCost

Casting, bed 32 h₹900
Steam curing12 h₹1,100
Cube test₹350
Cost per unit₹12,770

From the contract to the job’s profit, one record.

Follow one precast contract through Odoo. Every purchase, casting and bill writes to the same project, so its margin is known while the job is still running.

  1. 01

    Plan

    The contract becomes a project with its milestones. Every cost from here on is tagged to it.

    • Project
    • Sales
    A stack of project files
    PRJ/0412In progress
    Client
    Builder
    Site
    Tech park Tower B, Whitefield
    Scope
    120 hollow-core slabs
    Contract
    ₹1.84 crore
    Billing
    By milestone
  2. 02

    Buy

    Cement and steel are bought against the project, so their cost lands on the right job.

    • Purchase
    A sack of cement
    PO/0388Received
    Supplier
    Cement depot, Hoskote
    Product
    OPC 53, 50 kg
    Quantity
    800 bags
    Project
    PRJ/0412
  3. 03

    Cast & test

    Each slab is a work order on its bed. Its cube test is recorded on the piece as a quality check.

    • Manufacturing
    • Quality
    A clipboard with cube test results
    MO/0731Done
    Product
    Slab, 6 m
    Piece
    SL-0412-07
    Bed
    3, Jigani yard
    Cube test, 7 days
    24.1 MPa Pass
    Cost
    ₹38,400
  4. 04

    Deliver to site

    Pieces go out on a delivery to the site, with the e-way bill. The site confirms what arrived.

    • Inventory
    Buildings on the site
    WH/OUT/00731Delivered
    To
    Tower B site, Whitefield
    Pieces
    SL-0412-07 SL-0412-08
    Vehicle
    Trailer 4
    E-way bill
    Generated
  5. 05

    Bill progress

    When a milestone is done, its invoice comes from the sale order. Nothing waits for someone to work it out.

    • Sales
    • Accounting
    A laptop showing the progress invoice
    INV/2026/1184Posted
    Client
    Builder
    Milestone
    2 of 5, slabs 25–48
    Billed
    ₹36.8 lakh
    GST
    18%
    Due
    7 Dec 2026
  6. 06

    Cost the job

    Material, labour and subcontractors sit against the billing on one project, while it runs.

    • Project
    • Accounting
    A set of account books
    PRJ/0412
    Billed to date
    ₹73.6 lakh
    Material
    ₹41.2 lakh
    Labour
    ₹9.8 lakh
    Margin to date
    ₹22.6 lakh

Walk us through how yours runs

Where construction businesses lose money, and what we’d do.

  • Material sent to site and forgotten.

    Cement and steel leave on a challan; what was used and what is lying around, nobody knows.

    What we’d do

    Make each site a stock location, and issue material against the project.

    Site stock is still your money. Once it is a location, it can be counted and reconciled.

    Inventory

  • Job cost known after the job.

    Purchases, labour and hire land in general expenses, so profit per project shows at year end.

    What we’d do

    Tag every purchase, timesheet and bill to the project.

    Then the margin is visible while there is still time to do something about it.

    Project

  • Progress bills raised late.

    Billing waits for someone to work out what was done last month.

    What we’d do

    Bill by milestone from the sale order as soon as the milestone is marked done.

    Every week a bill waits is a week of your working capital funding the client.

    Sales

  • Casting beds standing idle.

    Beds sit empty while the yard waits for moulds, steel or an approved drawing.

    What we’d do

    Plan castings by bed, as work centres, against the delivery schedule.

    A bed is the yard’s real capacity. Schedule it like a machine.

    Manufacturing

  • Cube tests in a register.

    Strength results are on paper, and finding one for a client query takes a day.

    What we’d do

    Record the cube test as a quality check on each casting.

    The result is then on the piece’s record, found in seconds, and a failed piece is flagged before it leaves the yard.

    Quality

  • Subcontractor bills paid on trust.

    Labour contractors bill for work measured by their own count.

    What we’d do

    Pay subcontractors against work measured and recorded on the project.

    This needs some set-up. It is worth it on any job with a large labour contractor.

    Purchase

Tell us which one is costing you

Where you’re coming from.

Live in 8–14 weeks. Nothing switches off until your books agree.

  • Tally and spreadsheets

    Where most contractors and yards we meet start. Project costs in Excel become analytic accounts from the first day.

    What moves across

    • Item, client and supplier masters
    • Open projects with their contract values
    • Open invoices, balances and advances
  • A construction ERP the yard never used

    The office used it; the yard kept registers. Odoo is set up so the yard records its own work.

    What moves across

    • Projects and their milestones
    • Stock at the yard and each site
    • Open purchase orders and balances
  • SAP or an older ERP

    The data comes across; the workarounds built around the old system don’t.

    What moves across

    • Masters and mix designs as bills of materials
    • Open projects and orders
    • Open balances, checked against your books
Tell us how you run

Questions construction businesses ask.

More questions

Can Odoo do progress billing?

Yes, as standard. Invoice by milestone, by percentage of the order, or from delivered quantities, each tied to the project and its sale order.

Can it handle RA bills and retention money?

With some set-up. Running account bills are progress invoices against the contract, and retention can be held back on each one and released at the end.

Does Odoo do BOQs and estimates?

There is no BOQ app in standard Odoo. A BOQ is usually set up as the quotation with its sections and lines, or imported from your estimating sheet, so the project starts with its budget.

Can we track stock at each site?

Yes. Each site is a stock location, material moves to it by transfer and is issued against the project, so what is still at the site stays visible.

How does project costing work?

Each project has an analytic account. Purchases, vendor bills, timesheets and expenses are tagged to it, and the project shows its costs against what has been billed.

Can we run the precast yard in the same system?

Yes. Castings are manufacturing orders, beds are work centres, and mix designs are bills of materials, all costed to the project they were cast for.

What about our equipment and hired plant?

Equipment can be tracked with its maintenance in the Maintenance app, and hire charges booked to the project. Equipment you rent out to others runs through the Rental app.

Does it handle GST, TDS and e-way bills?

Yes, through Odoo’s Indian localisation: GST on every invoice, TDS on payments, and e-invoices and e-way bills generated from the system.

Can you move us off SAP or an older ERP?

Yes. We’ve moved groups off SAP and other ERPs. Masters and open balances come across, you run one month-end side by side, and you switch when the numbers agree. Planning shows where Odoo fits as it is and where it needs building.

Question not here? WhatsApp us.

Change how the business runs, not just the software.

A senior consultant reads every note and replies personally.

Tell us how you run

Or call +91 79750 29997 or WhatsApp us