Odoo ERP for manufacturing & supply chain

What the job actually cost, machine by machine, not what the estimate said.

Tell us how you run

Machined part

Lot GR-2207 Spur gears, 40 teeth

  1. FromEN8 bar, heat H-4471, Peenya
  2. Hobbing42 min on WC-03, MO/0731
  3. HardenedJob work, heat-treater, Hosur
  4. Cost₹212 a gear, standard ₹188
  5. ToMotor SN-48120

Assembly

Serial SN-48120 Motor, 3.7 kW

  1. BuiltMO/0744, bill of materials rev. C
  2. PartsGear GR-2207, bearings BR-0915
  3. Assembly3 h 10 min at WC-07
  4. TestedRun test passed, 2 Nov
  5. ToExport order, in crate PK-0331

Bought-in part

Lot BR-0915 Ball bearings, 6205

  1. FromBearing maker, Bommasandra, ₹46 each
  2. Checked20 of 400 sampled, passed
  3. StoredStores, bin R-12
  4. ReorderFell to 190, below min 200; PO raised
  5. ToMotor SN-48120, 2 pieces

Export

Pack PK-0331 Export crate, 86 kg

  1. HoldsMotor SN-48120
  2. Packed2 Nov, 86 kg, heat-treated wood
  3. ShippedShipping bill 4471203, Chennai port
  4. Billed$430, zero-rated under LUT
  5. ToPump maker, Dubai

What Odoo keeps track of, trade by trade.

  • A steel spur gear

    Machine shops & precision parts

    Routings with set-up and run times on every machine. Each lot of parts traced back to the heat of bar it was cut from.

  • An electric motor

    Assembled equipment

    Sub-assemblies with their own bills of materials, built in order. A serial number on every unit, with its test results.

  • A ball bearing

    Contract manufacturing for OEMs

    Customer schedules turned into manufacturing orders and purchase. Parts sent out for plating or heat treatment tracked as job work.

  • A wooden export crate

    Exporters

    Packed against the sale order, crate by crate, with weights on the packing list. Export invoices without GST or under LUT, in any currency.

Trade not listed? Tell us what you make

What one motor, gearbox or pump is made of, and what it really costs.

The bill of materials tells Odoo what to buy, what to machine and what each unit costs. Point at a part to find its line.

BoM: Electric motor, 1.5 kW

ComponentQtyCost

Frame, cast iron, finned1₹1,850
Wound stator1₹2,900
Rotor and shaft, EN81₹980
Shaft key1₹15
Ball bearing 6205, drive end1₹150
Ball bearing 6204, far end1₹120
End shield, drive end1₹420
End shield, far end1₹380
Tie bolts, M64₹60
Cooling fan1₹90
Fan cowl1₹140
Terminal box1₹160
Terminal box lid1₹45

OperationTimeCost

Winding, winding bay45 min₹375
Assembly, line 120 min₹167
Test bench10 min₹100
Cost per unit₹7,952

From the bar stock to the invoice, one record.

Follow one motor through Odoo. Every step writes to the same serial number, so its cost and its history are in one place.

  1. 01

    Plan

    The sale order creates the manufacturing orders. Bearings that will run short raise their own purchase.

    • Sales
    • Manufacturing
    A stack of order files
    SO/2207Confirmed
    Customer
    Pump maker, Hosur
    Product
    Motor, 3 kW
    Quantity
    20
    Manufacturing
    MO/0744 onwards
    Short
    Bearings, PO/0388 raised
  2. 02

    Receive

    Bearings are scanned in by lot and checked at the dock. A failed check never becomes stock.

    • Inventory
    • Quality
    A handheld barcode scanner
    WH/IN/00412Done
    Supplier
    Bearing maker
    Product
    Ball bearing 6205
    Quantity
    600
    Lot
    BR-0915
    Bore
    25.00 mm Pass
  3. 03

    Make

    Operators start and finish each work order on a tablet. Parts are drawn by lot and time is booked as it happens.

    • Manufacturing
    • Shop Floor
    A part with a serial number plate
    MO/0744Done
    Product
    Motor, 3 kW
    Serial
    SN-48120
    Gear
    GR-2207
    Bearings
    BR-0915
    Actual cost
    ₹14,860
  4. 04

    Test

    The run test is a quality check on the serial number. A motor that fails goes to rework, not to the crate.

    • Quality
    A clipboard with a test checklist
    QC/0217Done
    Serial
    SN-48120
    Insulation
    520 MΩ Pass
    No-load current
    3.1 A Pass
    Run test
    30 min Pass
  5. 05

    Pack & dispatch

    Each crate is a package on the delivery, with the serials inside it. The e-way bill comes from the same record.

    • Inventory
    A pallet of packed cartons
    WH/OUT/00731Delivered
    Customer
    Pump maker, Hosur
    Packages
    PK-0331 PK-0332
    Serials
    SN-48120 SN-48121
    E-way bill
    Generated
  6. 06

    Bill & collect

    The GST invoice and its e-invoice come from the delivery. The serials are printed on it, for the warranty.

    • Accounting
    A laptop showing the invoice
    INV/2026/1184Posted
    Customer
    Pump maker, Hosur
    Serials
    SN-48120 SN-48121
    GST
    18%
    E-invoice
    IRN generated
    Due
    7 Dec 2026

Walk us through how yours runs

Where manufacturers lose money, and what we’d do.

  • Costing from last year’s spreadsheet.

    The quote uses a standard cost nobody has checked since the steel price moved.

    What we’d do

    Cost each manufacturing order on the material and time it actually used.

    Compare actual against standard every month. The products losing money are rarely the ones anyone suspects.

    Manufacturing

  • Job work by challan book.

    Parts go to the plater or the heat-treater on paper, and nobody knows what is still with them.

    What we’d do

    Run job work as subcontracting, with each vendor as a stock location.

    Material at a vendor is still your stock. Once it is a location, you can count it.

    Purchase

  • The line stops for a ₹40 part.

    A seal or a bearing runs out because the reorder level lives in the storekeeper’s head.

    What we’d do

    Put min and max reordering rules on every bought-in part.

    Start with the fifty parts that stop the line, not all five thousand.

    Inventory

  • Rework nobody counts.

    Rejected parts are reworked quietly, so the scrap rate looks fine and the cost doesn’t.

    What we’d do

    Put quality checks on the work order and record scrap where it happens.

    A failed check with a reason is the start of fixing it. A good part made twice is not a good part.

    Quality

  • Work in progress nobody can see.

    Ask where an order is and someone walks the floor to find out.

    What we’d do

    Put work orders on a tablet at each work centre.

    When operators start and finish on the screen, the times are real and every order’s position is known.

    Shop Floor

  • The old bill of materials.

    Engineering changed the design; the floor still builds the old one.

    What we’d do

    Keep one live bill of materials per product, with a version for every change.

    PLM in Enterprise runs engineering changes properly. Even without it, one owner per BOM fixes most of this.

    Manufacturing

Tell us which one is costing you

Where you’re coming from.

Live in 8–14 weeks. Nothing switches off until your books agree.

  • Tally and spreadsheets

    Where most manufacturers we meet start. Bills of materials in Excel become live BOMs from the first day.

    What moves across

    • Item, customer and supplier masters
    • Bills of materials and routings
    • Open stock, open orders and balances
  • SAP Business One or an older ERP

    The data comes across; the workarounds built around the old system don’t.

    What moves across

    • Masters, BOMs and work centres
    • Open purchase and sale orders
    • Open balances, checked against your books
  • A production package beside Tally

    Production in one tool, money in another, and nobody sure the two agree.

    What moves across

    • Products, BOMs and work centres
    • Open work orders and stock
    • Open balances, checked against your books
Tell us how you run

Questions manufacturers ask.

More questions

Can Odoo handle multi-level bills of materials?

Yes, as standard. Sub-assemblies have their own BOMs and routings, and can be built to order or from stock. Kits, by-products and variants of one product are handled too.

Does it handle job work and subcontracting?

Yes. Subcontracting sends the components to the vendor and receives the finished part against its BOM, so the material at each vendor stays visible. The Indian job-work challan format and ITC-04 reporting need some set-up.

How does Odoo work out product cost?

From the bill of materials and each work centre’s hourly rate. Every manufacturing order records what it actually consumed and how long it took, so you can compare the real cost with the standard.

Can operators use it on the shop floor?

Yes. The Shop Floor app runs on a tablet at each work centre: operators see their instructions, start and stop the job, record quantities and scrap, and complete quality checks. It is part of Odoo Enterprise.

Can it schedule capacity on our machines?

Work centres carry their capacity and working hours, and work orders are planned against them. For most plants that is enough; a job shop with hundreds of interlocking operations may need a dedicated scheduler alongside.

Can we trace a part back to its raw material?

Yes. Lots and serial numbers follow each part from the receipt through every manufacturing order to the delivery, and the traceability report shows the chain both ways.

Does it cover machine maintenance?

Yes. The Maintenance app schedules preventive work by date or by usage, and breakdowns are logged against each machine. Its downtime blocks the work centre, so planning knows the machine is out.

Does it handle GST, e-invoicing and e-way bills?

Yes, through Odoo’s Indian localisation: GST on every invoice, e-invoices and e-way bills generated from the system, and GSTR returns from the same books.

Can you move us off SAP or an older ERP?

Yes. We’ve moved groups off SAP and other ERPs. Masters and open balances come across, you run one month-end side by side, and you switch when the numbers agree. Planning shows where Odoo fits as it is and where it needs building.

Question not here? WhatsApp us.

Change how the business runs, not just the software.