Build and proof
Serial RF-0031 Rifle, contract PRJ-0214
- BarrelBR-48120, inspected on receipt
- BuiltMO/0214, 6.5 h booked
- ProofPT-0031, passed, customer QA present
- PackedCase CS-0031, seal S-77120
- ToAuthorised buyer, lot 2 of 3
Every unit carries its serial, its inspection record and the contract it was built for.
Tell us how you runBuild and proof
Order and register
Vehicle build
Bought-in part

Every barrel, bolt and receiver serial-numbered, and the proof test recorded against the weapon’s serial. The build record shows which parts went into which rifle.

Each vehicle built to its bill of materials, with its frame and engine numbers recorded. A spare or a warranty claim finds the right serial.

Airframes, motors and flight controllers serial-numbered, and every build tied to its bill of materials and flight test. A part changed by revision shows which airframes carry it.

Lots traced from raw material to the finished carton, with each lot’s test recorded against it. Shelf life and storage location stay on the lot.

Every board and module serial-numbered from receipt to dispatch. Each contract runs as a project, with its tender papers, costs and milestone billing kept on it.

Incoming, proof, in-process and acceptance checks recorded per lot and serial. The history is there when the customer’s QA asks.
The bill of materials records which serial-numbered barrel and bolt went into each rifle, which frame and engine into each vehicle, and which board into each module. Point at a part to find its line.
ComponentQtyCost
OperationTimeCost
ComponentQtyCost
OperationTimeCost
ComponentQtyCost
OperationTimeCost
Follow one rifle through Odoo: every part bought, hour spent and test passed lands on the same contract.
Barrel blanks are bought against the contract, so their cost is the contract’s from the purchase order.

PO/0907ReceivedEach blank is received with its serial number and inspected before it reaches the store.

WH/IN/01455DoneThe work order records which barrel, bolt and receiver go into which rifle. Operators’ hours are booked to it.

MO/0214DoneThe proof test is recorded against the rifle’s serial, with the inspector’s sign-off.

PT-0031DoneThe delivery lists every serial in the lot. The acceptance record and the customer’s note are attached to it.

WH/OUT/00612DoneThe milestone invoice is raised from the project. Cost to date sits beside it.

INV/2026/0388PostedPurchases and hours land in overheads, and the margin is a guess until the audit.
Put every purchase line and timesheet on the project’s analytic account.
Cost by project as it happens is what lets you price the next tender with any confidence.
Accounting
The customer asks which barrel went into a rifle shipped two years ago.
Track every unit by serial from receipt to dispatch.
The build record answers it in one search, and the answer holds up when QA checks.
Inventory
The report exists, but finding the one for this lot takes a day.
Record inspections as quality checks on the lot or serial.
Attach the signed sheet to the check. The record is then wherever the part is.
Quality
A milestone is met in March and invoiced in May, because nobody told accounts.
Bill milestones from the project as soon as they’re marked reached.
Long contracts live on cash flow. The invoice should follow the work, not the paperwork.
Sales
Engineers work across projects and fill timesheets at month end from memory.
Book hours on the work order and the task as they happen.
Labour is often the biggest cost in a build, and the least measured.
Timesheets
Orders over a limit sit on a printed form until someone in another city signs it.
Route purchase approvals in Odoo by amount.
The approval is on record with the order, and nobody waits for a courier.
Purchase
Live in 8–14 weeks. Nothing switches off until your books agree.
Common at MSME suppliers. Project costs live in Excel, serials in a register.
What moves across
Usual at larger contractors. Projects, bills of materials and open orders come across; the bolt-on spreadsheets don’t.
What moves across
Plans in one tool, books in another, and a monthly reconciliation in between.
What moves across
Yes, as standard. Each unit is received, built in and dispatched with its serial, and the traceability report shows the full chain both ways.
Yes. Purchases, timesheets and manufacturing costs carry the project’s analytic account, so cost and margin per project are a report, not a reconciliation.
Yes, as quality checks on the weapon’s serial: the result, who passed it and when, with the signed proof sheet attached. A failed proof raises a quality alert and holds the serial.
Yes. Odoo runs on-premise as well as in the cloud, and access is controlled by user roles and record rules. Air-gapped installs need a plan for updates, which we make with your IT team.
Odoo holds the evidence: inspections, quality alerts, corrective actions and documents per lot and serial. Certification is about your process; Odoo keeps the records, it doesn’t certify them.
Yes. A sale order can be invoiced by milestone, linked to the project, so each invoice is raised when its milestone is marked reached.
Partly. Tenders can be tracked as opportunities in CRM with their documents. There is no GeM integration, so GeM orders are entered as sale orders.
Yes. Quality checks record who passed them and when, and signed sheets can be attached. Odoo Sign can collect signatures on acceptance documents.
Yes, through Odoo’s Indian localisation: GST on every invoice, e-invoices and e-way bills generated from the system, and GSTR returns from the same books.
Yes. We’ve moved groups off SAP and other ERPs. Masters and open balances come across, you run one month-end side by side, and you switch when the numbers agree. Planning shows where Odoo fits as it is and where it needs building.
Question not here? WhatsApp us.
A senior consultant reads every note and replies personally.
Or call +91 79750 29997 or WhatsApp us