Odoo ERP for solar & energy

Every panel and inverter traced by serial, from purchase to the last service visit.

Tell us how you run

Home rooftop

PRJ/0317 3.3 kW rooftop, Electronic City

  1. Panels6 × 550 Wp, serials scanned on the roof
  2. Inverter3 kW on-grid, SN INV-41552
  3. Net meterBESCOM, fitted 12 Nov
  4. Paid₹2,05,000 incl. GST, modules at 5%
  5. Subsidy₹78,000, to the owner’s bank account

Factory EPC

PRJ/0142 50 kW factory rooftop

  1. Contract₹22,40,000, milestones 40 / 50 / 10
  2. Inverter50 kW, SN INV-40917
  3. Commissioned10 Nov 2026, earthing test passed
  4. Billed₹20,16,000, two of three milestones
  5. Margin16%, cable ₹38,000 over estimate

Service and AMC

SN BT-7704 5 kWh battery, Jigani

  1. SiteHome, 5 kW hybrid, since Jun 2026
  2. FaultShort backup, ticket #0912
  3. WarrantyTo Jun 2031, found by serial
  4. ClaimModule replaced, claimed from the maker
  5. BilledAMC ₹1,500 a quarter, recurring

What Odoo keeps track of, trade by trade.

  • A house

    Rooftop for homes

    Many small jobs, each a survey, a quote and an install. Subsidy papers and net-metering approvals kept on the site.

  • Office towers

    Commercial & industrial rooftop

    Each plant a project with its own budget and milestone bills. Every panel and inverter serial tied to the site.

  • A solar panel

    EPC & ground-mount

    Large purchases against one project, with structure, cable and labour costed to it. Progress billed by milestone.

  • A battery

    Inverter & battery distribution

    Stock by serial number across warehouses and dealers. Warranty claims checked against the sale date.

Trade not listed? Tell us what you install

What one panel set, inverter or battery is made of, and what it really costs.

For a job, the bill of materials is the site kit, with every module, inverter and battery carrying its serial. If you assemble inverters or batteries, it goes down to the board and the cell. Point at a part to find its line.

BoM: Panel set, site kit, 545 Wp

ComponentQtyCost

Module, mono PERC, 545 Wp1₹13,130
Legs, GI4₹480
Mounting rails, C-channel2₹2,400
Module clamps4₹140
DC cable with MC4, 4 mm²2₹240

OperationTimeCost

Erection, site team25 min₹210
Cost per unit₹16,600

From the roof survey to the service visit, one record.

Follow one 50 kW rooftop project through Odoo. Survey, purchases, serials and bills all sit on the same project, so its margin is never a guess.

  1. 01

    Survey

    The surveyor fills a worksheet on the roof, with photos. The quote is built from it, not retyped.

    • CRM
    • Project
    A survey checklist on a clipboard
    Site survey, BommasandraDone
    Lead
    Textile factory
    Roof
    5,200 sq ft, RCC
    Sanctioned load
    75 kW
    Shade
    None after 9 am
    Photos
    12 attached
  2. 02

    Quote

    The design becomes a quote with modules, inverter, structure and labour. Payment milestones are agreed on it.

    • Sales
    A file of drawings for the site
    SO/0142Confirmed
    Customer
    Textile factory
    System
    50 kW on-grid
    Modules
    92 × 545 Wp
    Total
    ₹22,40,000
    Milestones
    40 / 50 / 10
  3. 03

    Buy & receive

    Modules and the inverter are bought for the project. Every serial is scanned in at the warehouse.

    • Purchase
    • Barcode
    A pallet of cartons
    PO/0611Received
    Supplier
    Distributor, Peenya
    Modules
    92, lot PL-2611
    Inverter
    INV-40917
    For
    PRJ/0142
  4. 04

    Install

    Materials are issued to the site and the serials scanned on the roof. Commissioning tests are recorded on the task.

    • Project
    • Barcode
    A barcode scanner
    PRJ/0142 · InstallDone
    Panels
    92 serials scanned
    Inverter
    INV-40917
    Earthing test
    Pass
    Commissioned
    18 Nov 2026
  5. 05

    Bill

    Each milestone is invoiced when it’s reached. The project shows what’s been spent against what’s been billed.

    • Accounting
    A laptop showing the invoice
    INV/2026/0612Posted
    Customer
    Textile factory
    Project
    PRJ/0142
    Milestone
    2 of 3, installation
    Amount
    ₹11,20,000
    E-invoice
    Generated
  6. 06

    Service

    Service calls are logged against the inverter’s serial. The warranty and the AMC are on the same screen.

    • Helpdesk
    A rugged handheld
    Ticket #0884Solved
    Site
    PRJ/0142
    Inverter
    INV-40917
    Issue
    Low generation, string 3
    Cover
    Under warranty
    Visit
    2 Dec 2026

Walk us through how yours runs

Where solar businesses lose money, and what we’d do.

  • Surveys retyped into quotes.

    Roof photos on a phone, measurements in a notebook, and the quote built again in the office.

    What we’d do

    Run surveys as Field Service tasks with a worksheet.

    The surveyor fills it once on the roof. The design team quotes from it the same day.

    Project

  • Projects without a margin.

    Cable, structure and labour go to the site and never reach its costs.

    What we’d do

    Give each project an analytic account and issue every material to it.

    Solar margins are thin. You want the overrun on the cable visible before the plant is commissioned, not at year end.

    Accounting

  • The second milestone forgotten.

    Installation finished weeks ago, and the invoice for it hasn’t gone out.

    What we’d do

    Put the milestones on the sales order and bill from them.

    When the project task closes, the milestone is ready to invoice. Nobody has to remember.

    Sales

  • Warranty on the wrong inverter.

    An inverter fails, and nobody can say which site has the one still under warranty.

    What we’d do

    Scan every inverter and battery serial in and out.

    It costs seconds at dispatch. It saves the argument with the manufacturer later.

    Barcode

  • Approvals chased on WhatsApp.

    Net-metering applications, subsidy papers and the customer’s documents sit in phone chats.

    What we’d do

    Keep each site’s documents on its project.

    Then anyone in the office can see what’s pending with the DISCOM, without ringing the field engineer.

    Documents

  • AMCs that lapse.

    Service contracts expire and the cleaning visits carry on for free.

    What we’d do

    Put AMCs on Subscriptions, so they bill and renew on schedule.

    Recurring service is the steadiest money in solar. It should never depend on someone’s calendar.

    Sales

Tell us which one is costing you

Where you’re coming from.

Live in 8–14 weeks. Nothing switches off until your books agree.

  • Tally and spreadsheets

    Where most installers start. A project sheet per site becomes a project with its costs from the first day.

    What moves across

    • Item, customer and supplier masters
    • Open stock, counted by serial number
    • Open invoices, advances and balances
  • A separate CRM and Tally

    Leads in one place and money in another. Both move onto the same project.

    What moves across

    • Open leads and surveys
    • Live projects with their milestones
    • Customer balances, checked against your books
  • SAP or an older ERP

    The data comes across; the workarounds built around the old system don’t.

    What moves across

    • Projects, serials and service history
    • Open balances, checked against your books
    • Custom modules dropped where Field Service or Subscriptions now does the job
Tell us how you run

Questions solar businesses ask.

More questions

Can surveys be done on a phone?

Yes. Field Service tasks open on the phone with a worksheet you design, photos and the customer’s signature. Field Service is part of Odoo Enterprise.

Can every panel and inverter be tracked by serial number?

Yes, as standard. Serials are scanned in at receipt and out at dispatch, so each one is tied to the site it went to and the supplier it came from.

Can we bill by milestone?

Yes. Milestones sit on the sales order and are invoiced as each is reached, with the advance deducted where you agreed it.

Will we see each project’s margin?

Yes. Each project has an analytic account, so materials issued, purchases, timesheets and invoices all land on it. The profitability report shows cost against billing.

Does Odoo handle the rooftop subsidy?

Not the scheme itself: the portal application stays on the government site. Odoo keeps the documents and status on the project, and the subsidy amount can be tracked as a receivable, with some set-up.

Can AMCs bill themselves?

Yes. Subscriptions invoice the contract monthly, quarterly or yearly and flag renewals. Visits are scheduled as Field Service tasks. Both are part of Odoo Enterprise.

How is GST handled on a solar system?

Through Odoo’s Indian localisation. Supply and installation can be split on the invoice with the rate that applies to each line, and e-invoices and e-way bills are generated from the system.

Can we track stock in vans and at sites?

Yes. Each van or site store can be its own location, so you know what’s on the roof, in the van and back in the warehouse.

Can you move us off SAP or an older ERP?

Yes. We’ve moved groups off SAP and other ERPs. Masters and open balances come across, you run one month-end side by side, and you switch when the numbers agree. Planning shows where Odoo fits as it is and where it needs building.

Question not here? WhatsApp us.

Change how the business runs, not just the software.

A senior consultant reads every note and replies personally.

Tell us how you run

Or call +91 79750 29997 or WhatsApp us