Odoo ERP for furniture, furnishing & interiors

Every sofa on the floor knows whose it is, what fabric it takes and when it’s due.

Tell us how you run

Made to order

MO/0562 3-seater sofa, teal linen

  1. OrderSO/1418, homeowner, Whitefield
  2. Size2,100 mm, longer than standard
  3. FabricLot FB-0907, 17.4 of 18 m used
  4. Hours22.5, across four work centres
  5. Due21 Nov, installed by two fitters

Variants

MO/0571 Dining chairs, set of 24

  1. OrderSO/1431, hotel, Mysuru
  2. VariantWalnut stain, velvet seat
  3. VelvetLot VL-08, 14.4 m, 0.6 m a seat
  4. FramesRubberwood lot RW-63, cut 12 Nov
  5. Margin27%: cost ₹4,950, price ₹6,800

Date promised

MO/0563 Teak dining table, 6-seater

  1. Size180 × 90 cm, teak lot TK-118
  2. Cutting8 h, done 10 Nov
  3. FinishingBooked to 18 Nov, three coats PU
  4. Promised21 Nov, with the sofa and chairs
  5. Advance₹1,24,000 of ₹2,48,000, on the order

Site project

PRJ/031 Kitchens, Tower B, Hebbal

  1. Scope24 kitchens, ₹43,20,000
  2. BoardPlywood PW-18, 310 sheets issued
  3. Fitted12 of 24, checklists signed
  4. Cost₹19,60,000 so far, 63% of budget
  5. BilledMilestone 2 of 3, ₹14,40,000

What Odoo keeps track of, trade by trade.

  • A three-seater sofa

    Made-to-order furniture

    Confirming the sale starts the manufacturing order. Frame, fabric and foam are drawn against that one order.

  • A kitchen cabinet

    Modular kitchens & wardrobes

    Each site is a project with its tasks, materials and milestone bills. Board is held in sheets and issued to the job.

  • A dining chair

    Office & contract furniture

    One chair in many finishes and fabrics, priced by the configurator. Bulk orders delivered and installed in phases.

  • An apartment block

    Interior fit-outs

    Design, civil work and furniture on one project. Subcontractor bills and site purchases land on its costs.

Trade not listed? Tell us what you make

What one chest of drawers, office chair or sofa is made of, and what it really costs.

The bill of materials turns the order into board, foam, fabric, hardware and hours, so a quote is priced on what the piece really takes. Point at a part to find its line.

BoM: Chest of drawers, teak laminate

ComponentQtyCost

Top panel, 18 mm1₹950
Side panel, left1₹780
Side panel, right1₹780
Base panel, 18 mm1₹620
Back panel, hardboard1₹260
Drawer boxes3₹1,140
Drawer fronts, laminate3₹1,350
Handles, bar pull3₹270
Runners, left3₹345
Runners, right3₹345
Legs, turned4₹480
Edge band9 m₹180

OperationTimeCost

Panel saw25 min₹210
Edge banding15 min₹125
Assembly40 min₹330
Cost per unit₹8,165

From the showroom to the installed sofa, one record.

Follow one made-to-order sale through Odoo. The quote, the job, the fabric and the fitting all point back to the same order.

  1. 01

    Quote

    Fabric, finish and size are chosen in the configurator, and each one moves the price. The quote becomes the order.

    • Sales
    A file of drawings and fabric swatches
    SO/1418Confirmed
    Customer
    Homeowner, Whitefield
    Sofa
    3-seater, teal linen
    Dining set
    Table + 6 chairs, teak
    Total
    ₹2,48,000
    Advance
    ₹1,24,000 received
  2. 02

    Buy

    The fabric this order needs is bought against it. Stock already on the shelf is used first.

    • Purchase
    • Inventory
    A carton of fabric rolls
    PO/0388Received
    Supplier
    Fabric supplier, Bommasandra
    Fabric
    Teal linen, 18 m
    Lot
    FB-0907
    For
    SO/1418
  3. 03

    Make

    The job runs through cutting, frame, upholstery and finish. Each work centre records its time.

    • Manufacturing
    • Shop Floor
    A rugged tablet at the workbench
    MO/0562Done
    Product
    3-seater sofa, teal linen
    Source
    SO/1418
    Frame
    FR-221
    Fabric
    FB-0907, 17.4 m used
    Hours
    22.5 across 4 work centres
  4. 04

    Check

    Stitching, colour and finish are checked before it leaves. Photos go on the record.

    • Quality
    A checklist on a clipboard
    QC/0219Pass
    Order
    SO/1418
    Stitching
    Pass
    Colour match
    Pass
    Photos
    4 attached
  5. 05

    Deliver & install

    The delivery books the fitters as a Field Service task. The customer signs on the tablet.

    • Inventory
    • Project
    A wrapped carton labelled for the homeowner
    WH/OUT/00731Delivered
    Customer
    Homeowner, Whitefield
    Items
    Sofa, table, 6 chairs
    Order
    SO/1418
    Installed
    21 Nov, 2 fitters
    Sign-off
    Signed on site
  6. 06

    Bill & collect

    The final invoice deducts the advance taken in the showroom. The e-way bill comes from the delivery.

    • Accounting
    A laptop showing the invoice
    INV/2026/0947Posted
    Customer
    Homeowner, Whitefield
    Order
    SO/1418
    Advance
    ₹1,24,000 deducted
    GST
    18%
    Balance due
    ₹1,24,000 by 28 Nov

Walk us through how yours runs

Where furniture businesses lose money, and what we’d do.

  • Custom sizes priced from memory.

    A longer sofa in a premium fabric is quoted at the standard price, and the margin goes with it.

    What we’d do

    Price every option through the configurator, with its cost behind it.

    Salespeople shouldn’t be doing the costing in their heads. Once the extra is on the attribute, every quote carries it.

    Sales

  • Fabric bought twice.

    Offcuts and part rolls aren’t counted, so the same linen is ordered again.

    What we’d do

    Hold fabric in metres and board in sheets, with each roll as its own lot.

    Most workshops already own the stock they keep buying. Counting it in the unit you cut it in is the fix.

    Inventory

  • Dates promised in the showroom.

    The salesperson promises three weeks; the workshop has five weeks of jobs ahead of it.

    What we’d do

    Plan work orders by work centre before a date is promised.

    Upholstery is usually the bottleneck. Show the showroom its queue and the promises get honest.

    Manufacturing

  • Second visits for a missing handle.

    The fitters go back for hardware nobody packed, and nobody bills it.

    What we’d do

    Install from a checklist, with the customer’s sign-off on the tablet.

    The checklist catches the handle at dispatch. The sign-off ends the argument about what was fitted.

    Project

  • Site jobs that quietly overrun.

    Board, hardware and labour go to a kitchen project and never reach its costs.

    What we’d do

    Run each site as a project with its own analytic account.

    Then every issue and every subcontractor bill lands on the job, and you see the overrun while it can still be billed.

    Accounting

  • Advances in a book.

    Advances taken in the showroom are written down and matched to the final bill by hand.

    What we’d do

    Take the advance as a down payment on the sales order.

    The final invoice deducts it on its own, and the customer’s balance is right on the day of delivery.

    Accounting

Tell us which one is costing you

Where you’re coming from.

Live in 8–14 weeks. Nothing switches off until your books agree.

  • Tally and spreadsheets

    Where most workshops start. Job cards on paper become manufacturing orders from the first day.

    What moves across

    • Item, customer and supplier masters
    • Fabric, board and hardware stock, counted in their units
    • Open orders, advances and balances
  • A showroom billing package

    The showroom bills and the workshop guesses. Both move onto the same orders.

    What moves across

    • Products with their finishes and fabrics as variants
    • Price lists and open quotations
    • Customer balances, checked against your books
  • SAP or an older ERP

    The data comes across; the workarounds built around the old system don’t.

    What moves across

    • Bills of materials, orders and stock
    • Open balances, checked against your books
    • Custom modules dropped where the standard configurator now does the job
Tell us how you run

Questions furniture businesses ask.

More questions

Can a customer choose fabric, finish and size on one product?

Yes. Each choice is an attribute with its own price extra, and the product configurator builds the variant on the quote. The bill of materials can change with the choice, so a teak finish draws teak.

Does confirming a sale start the job?

Yes, with make-to-order routes. Confirming the order creates the manufacturing order, and buys whatever components aren’t in stock.

Can fabric be stocked in metres and board in sheets?

Yes. Each item has its own unit of measure, and you can buy in rolls and issue in metres. Part rolls stay as stock with their lot.

How do you schedule installation?

As Field Service tasks, booked after delivery, with the fitters, a checklist and the customer’s signature. Field Service is part of Odoo Enterprise.

Can site projects be billed by milestone?

Yes. The sales order carries the milestones, the project tracks the work, and each milestone is invoiced when it’s reached. Costs land on the project’s analytic account.

We have a showroom. Can it bill there?

Yes. The showroom can take orders and advances through Sales or Point of Sale, and the advance is deducted from the final invoice.

What about warranty and repairs?

Odoo’s Repairs app records each repair against the customer and the product, with the parts used. Whether it’s billed depends on the warranty, which you set per product.

Does it handle GST and e-way bills?

Yes, through Odoo’s Indian localisation: GST on every invoice, e-invoices and e-way bills generated from the system, and GSTR returns from the same books.

Can you move us off SAP or an older ERP?

Yes. We’ve moved groups off SAP and other ERPs. Masters and open balances come across, you run one month-end side by side, and you switch when the numbers agree. Planning shows where Odoo fits as it is and where it needs building.

Question not here? WhatsApp us.

Change how the business runs, not just the software.

A senior consultant reads every note and replies personally.

Tell us how you run

Or call +91 79750 29997 or WhatsApp us