Odoo ERP for electronics

Every board carries its serial, its parts and its test result, so a return finds its batch.

Tell us how you run

Warranty return

SN PM-40917 Power module, rev C

  1. BuiltMO/0417, line 2
  2. CapacitorReel lot R-77120, date code 2638
  3. Burn-in4 h at 55°C, passed
  4. ShippedTelecom equipment maker, e-invoice
  5. ReturnNo output; same reel in 38 units

Imported parts

SN SP-22604 Bluetooth speaker

  1. DriverLot DR-1183, imported, $2.40 at ₹88
  2. Landed₹258 each, duty and freight added
  3. Audio testPassed, station 2
  4. Warranty12 months, from the sale
  5. ToDealer, Hyderabad

Engineering change

SN TH-71530 Room thermostat

  1. RevisionRev D, by change order ECO-0042
  2. Firmwarev2.4.1, flashed at end of line
  3. CalibrationWithin 0.3°C, certificate attached
  4. Warranty24 months, from dispatch
  5. ToHVAC contractor, Pune, 40 units

Contract build

SN PH-90312 Handset, built on contract

  1. ForHandset brand, contract job
  2. PartsTheirs, held as customer stock
  3. TestsAOI, flashing and RF, passed
  4. Billed₹185 a unit, 2,000 units, ₹3,70,000
  5. ToBrand’s warehouse, Noida

What Odoo keeps track of, trade by trade.

  • A phone

    Contract manufacturing & EMS

    Each customer’s BoM and the parts they supply, kept as their stock. Cost and yield seen per customer.

  • A speaker

    Consumer electronics

    Models and variants sold to dealers and online. Warranty runs from the sale of each serial number.

  • A finned power module

    Power supplies & modules

    Multi-level BoMs from board to box. Burn-in results recorded against every unit.

  • An inverter

    Inverters & UPS

    Boards, magnetics and enclosures built up by serial. Service calls find the exact build.

  • A thermostat

    Controls, sensors & meters

    Firmware version and calibration certificate held on each unit, ready when the customer asks.

  • A barcode scanner

    Component distribution

    Reels and lots by date code across warehouses. Imports costed with duty and freight.

Trade not listed? Tell us what you make

What one power module, inverter or trimmer is made of, and what it really costs.

The bill of materials is where the margin is decided, a board at a time. Point at a part to find its line.

BoM: Power module, serial-tracked

ComponentQtyCost

Enclosure base, machined aluminium1₹14,200
Standoffs, M34₹160
Power board assembly1₹19,800
Lid gasket, conductive1₹1,400
Lid1₹4,200
Lid screws, M46₹180
Heat sink, extruded1₹2,600
Circular connectors2₹6,400
Serial nameplate1₹240

OperationTimeCost

Board assembly3 h₹2,700
Assembly2 h₹1,800
Acceptance test1 h₹1,500
Cost per unit₹55,180

From the purchase order to the service call, one serial.

Follow one order of 500 power modules through Odoo. Parts, boards, test results and the invoice all point to the same units, so a return a year later still finds its batch.

  1. 01

    Plan

    The order is confirmed and the BoM opens out, level by level. Short parts show before the line is booked, not on it.

    • Sales
    • Manufacturing
    A file with the order and drawings
    MO/0417Confirmed
    Customer
    Telecom equipment maker
    Product
    Power module, rev C
    Quantity
    500
    Short
    Capacitor, 470 µF: 1,200
    Line booked
    SMT-2, 14 Nov
  2. 02

    Buy & receive

    Each reel is scanned in as its own lot, with its date code. Duty and freight land on the part’s cost.

    • Purchase
    • Barcode
    A stack of cartons of components
    PO/0862Received
    Supplier
    Component importer
    Part
    Capacitor, 470 µF
    Lot
    R-77120, date code 2638
    For
    MO/0417
    Landed cost
    Duty and freight added
  3. 03

    Build

    The operator follows the work order on a tablet. The board’s serial is scanned to the module’s.

    • Shop Floor
    A finned power module
    MO/0417 · AssemblyIn progress
    Module
    PM-40917
    Board
    PCB-88120
    Capacitor lot
    R-77120
    Work centre
    Line 2
    Time
    11 min
  4. 04

    Test

    Burn-in is a quality check on the work order. A failure goes to rework with its reason, and yield is counted.

    • Quality
    A test sheet on a clipboard
    Burn-in, 4 hPassed
    Unit
    PM-40917
    Output
    48.1 V
    Ripple
    Pass
    Tested by
    Test bench 3
  5. 05

    Ship & bill

    Serials are scanned out against the delivery. The invoice carries its e-invoice and the warranty starts.

    • Barcode
    • Accounting
    A laptop showing the invoice
    INV/2026/0733Posted
    Customer
    Telecom equipment maker
    Delivery
    500 serials
    Amount
    ₹4,12,50,000
    E-invoice
    Generated
  6. 06

    Service

    A return is logged against its serial. Cover, build and the capacitor lot are on one screen.

    • Helpdesk
    A rugged handheld
    Ticket #1207Solved
    Unit
    PM-40917
    Issue
    No output after surge
    Cover
    Under warranty
    Capacitor lot
    R-77120
    Same lot
    38 other units

Walk us through how yours runs

Where electronics makers lose money, and what we’d do.

  • Shortages found on the line.

    The BoM lives in Excel, so a ₹4 capacitor stops a line that was already booked.

    What we’d do

    Keep multi-level BoMs in Odoo and run planning from them.

    Shortages show when the order is confirmed, while there’s still time to buy. The line is only booked against parts you have.

    Manufacturing

  • Substitutes nobody recorded.

    Purchase swaps a part that’s out of stock. The build changes and the BoM doesn’t.

    What we’d do

    Make the swap on the manufacturing order, with the part tracked by lot.

    The unit’s real build is what’s kept. When that batch comes back, you can see which units had the other part.

    Manufacturing

  • Reels counted by guess.

    A part-used reel goes back to the shelf, and stock in the books drifts from stock on the rack.

    What we’d do

    Make every reel its own lot and scan it out and back with what’s left.

    Pick from the reel you can see the balance of. Counts stop being a month-end argument.

    Barcode

  • Costs at last year’s dollar.

    Imported parts are costed at a rate someone typed in, without duty or freight.

    What we’d do

    Post customs and freight as landed costs on each receipt, in its own currency.

    Component prices move every quarter. The product cost follows them, so you can see which quotes no longer pay.

    Accounting

  • Returns without a history.

    A unit comes back and warranty rests on the customer’s word and an old invoice.

    What we’d do

    Scan serials at dispatch and log every return against one.

    The sale date settles the warranty at the counter. Returns grouped by lot show a bad batch early.

    Helpdesk

  • Engineering changes by email.

    Revision D goes round on email while the floor is still building revision C.

    What we’d do

    Run changes as engineering change orders in Odoo PLM.

    Each revision is approved and dated, and the floor only ever sees the current one.

    Manufacturing

Tell us which one is costing you

Where you’re coming from.

Live in 8–14 weeks. Nothing switches off until your books agree.

  • Tally and spreadsheets

    Where most assemblers start. The BoM in Excel becomes the one the floor and purchase both work from.

    What moves across

    • Item masters, cleaned of duplicate part numbers
    • BoMs, level by level
    • Open stock, counted by lot and serial
  • A standalone MRP and Tally

    Production in one place and money in another. Both move onto the same record.

    What moves across

    • BoMs, routings and open work orders
    • Serial and warranty history
    • Open balances, checked against your books
  • SAP or an older ERP

    The data comes across; the workarounds built around the old system don’t.

    What moves across

    • BoMs, revisions, lots and serials
    • Open balances, checked against your books
    • Custom modules dropped where standard Odoo now does the job
Tell us how you run

Questions electronics makers ask.

More questions

Can every unit be tracked by serial number?

Yes, as standard. Serials are recorded as units are built and scanned out at dispatch, so each one is tied to its customer and its sale date.

Can a module’s serial be linked to its board’s?

Yes. The board’s serial is recorded as a component on the module’s manufacturing order. Traceability then runs both ways: from a unit to its parts, and from a bad lot to every unit it went into.

Can a BoM hold approved alternate parts?

Not as standard. You can swap a component on the manufacturing order and the change is recorded. If you need the approved list enforced, it’s a small custom module, and we’d tell you so at the planning stage.

Can we track reels and date codes?

Yes. Each reel is its own lot, scanned in at receipt and out to the line. A date code is a small added field on the lot.

We build for other brands, with parts they supply. Does that work?

Yes. Customer-supplied parts are held as stock owned by that customer, so they’re counted on your floor and stay off your balance sheet.

We send board assembly to an outside EMS. Does that work?

Yes, through subcontracting, which is standard. Odoo sends the kit, counts what’s out with them, and adds their charge to the product’s cost.

How are engineering changes handled?

Through PLM, part of Odoo Enterprise. Each change is an engineering change order with its approvals, and the BoM keeps its versions.

Does it handle GST, e-invoicing and e-way bills?

Yes, through Odoo’s Indian localisation: GST on every invoice, e-invoices and e-way bills generated from the system, and GSTR returns from the same books.

Can you move us off SAP or an older ERP?

Yes. Masters and open balances come across, you run one month-end side by side, and you switch when the numbers agree. Planning shows where Odoo fits as it is and where it needs building.

Question not here? WhatsApp us.

Change how the business runs, not just the software.

A senior consultant reads every note and replies personally.

Tell us how you run

Or call +91 79750 29997 or WhatsApp us